Goldhawk Bridge Restoration Ltd
Stand C11
Masonry Arch Bridge Restoration and Strengthening. Specialists in installation of the innovative, sustainable and cost effective MARS system for future proofing and strengthening bridges for uprated Rail and Highway loadings.
Prevents unnecessary costs associated with disruption to rail and road, temporary diversion of statutory services.
Extends the life of our Heritage stock of bridges with increases in capacity up to new highway loadings.
Documents
-
2022 Brochure (3.43 MiB)Details of the specilialist masonry arch strengthening with case histories.
-
Network Rail Bridge Strengthening (4.92 MiB)Case history of the stengthening of a Brunel Bridge without any requirement for possessions or changes to rail timetables.
-
Case History of Historic Bridge Strengthening (4.66 MiB)MARS strengthening to the historic Oundle North Viaduct
-
Case History (4.88 MiB)MARS strengthening to the listed historic Thrapston Nine Arch Bridge